Pierce Street Consolidated Water and Sewer Project - Draft Initial Study and Mitigated Negative Decl Pierce Street Consolidated Water and Sewer Project - Appendix C - Identification and Evaluation of H Pierce Street Consolidated Water and Sewer Project - Appendix B - Biological Resources Assessment Pierce Street Consolidated Water and Sewer Project - Appendix A - CalEEMOD Air Quality Greenhouse Ga HWY 86 Water Transmission Main, Phase 3 and 4 Project - Notice of Determination - Imperial County HWY 86 Water Transmission Main, Phase 3 and 4 Project - Notice of Determination - Riverside County WRP 4 Notice of Availability Public Meeting PowerPoint Presentation – August 2025 WRP 4 Appendix HYDRO-1 - Modeling the Potential Effects of Flow Reductions from WRP4 on downstream WRP 4 Appendix BIO - Biological Resources Technical Report WRP 4 Appendix AQ_GHG_ENERGY - Air Quality and Greenhouse Gas Emissions Calculations WRP 4 Draft EIR_ADA 508 FINAL WRP 4 Notice of Availability_ County Stamped WRP 4 Appendix TRIBAL - Tribal Cultural Resources Consultation WRP 4 Appendix NOP - NOP and Scoping Process WRP 4 Appendix HYDRO-2 - Applying the Salton Sea Accounting Model to the CVWD WRP 4 Recycled Water P Thousand Palms Channel Improvement Project – Stamped Notice of Determination Thousand Palms Channel Improvement Project - Appendix F – Responses to Comments Thousand Palms Channel Improvement Project - Final IS-MND 2020/21 NPW - Dept. of Fish and Wildlife 2025 Env. Document Filing Fee Cash Receipt - Addendum No. 1 2020/21 NPW - FY 2024-2025 NPW Pipeline Connections Project_051625_Final_No appendices 2020/21 NPW - Appendix C - Cultural Resources 2020/21 NPW - Appendix B - Bio Report 2020/21 NPW - Appendix A - CalEEMod Highway 86 Water Transmission Main, Phase 3 and 4 Project - Notice of Intent - Imperial County Highway 86 Water Transmission Main, Phase 3 and 4 Project - Notice of Intent - Riverside County 05/13/2025 HWY 86 Water Transmission Project - Final Initial Study and Mitigated Negative Declaration Updated 10/15/25 Highway 86 Water Transmission Main, Phase 3 and 4 Project - Appendix E - Geotechnical Investigation Highway 86 Water Transmission Main, Phase 3 and 4 Project - Appendix D - Energy Calculations Highway 86 Water Transmission Main, Phase 3 and 4 Project - Appendix C - Cultural Resources Inventor Highway 86 Water Transmission Main, Phase 3 and 4 Project - Appendix B - Biological Resources Techni Highway 86 Water Transmission Main, Phase 3 and 4 Project - Appendix A - Air Quality and Greenhouse CVWD Airport Blvd Sewer - Final IS-MND - Addendum No. 1 – 2025 – Stamped Notice of Determination CVWD Airport Blvd Sewer - Final IS-MND - Addendum No. 1 – 2025 Thousand Palms Channel Improvement Project - Appendix B2 - Aquatic Resources Delineation Report Thousand Palms Channel Improvement Project - Notice of Intent Updated 3/6/25 Thousand Palms Channel Improvement Project - Appendix D - Geotechnical Investigation Thousand Palms Channel Improvement Project - Appendix E - AB52 - Tribal Consultation Letters Thousand Palms Channel Improvement Project - Appendix C - Cultural Resources Assessment Thousand Palms Channel Improvement Project - Appendix B3 - CVWD Shoofly Biological Survey Notes Thousand Palms Channel Improvement Project - Appendix B1 - Biological Resources Assessment Thousand Palms Channel Improvement Project - Appendix A - Air Quality-Greenhouse Gas Modeling Data 2020-2021 NPW Connections Project - Final IS-MND - Addendum No. 1 – 2024 – Stamped Notice of Determi 2020-2021 NPW Connections Project - Final IS-MND - Addendum No. 1 – 2024 Notice of Preparation and Scoping Meeting Notice - November 2023 WRP 7 NPW Phase 1 Final IS-MND WRP 7 NPW Phase 1 – Notice of Determination WRP 7 Appendix I - Mitigation Monitoring and Reporting Program WRP 7 Appendix H - Response to Comments on the Draft IS-MND WRP 7 NPW Phase 1 - Appendix E - Construction Noise WRP 7 NPW Phase 1 - Appendix D - Energy Consumption Appendix WRP 7 NPW Phase 1 - Appendix C - CNPS Electronic Inventory WRP 7 NPW Phase 1 - Appendix B - CNDDB Summary Table WRP 7 NPW Phase 1 - Appendix A - CalEEMod outputs_V2 WRP 7 NPW Phase 1 Draft IS-MND WRP 7 NPW Phase 1 - Notice of Intent WRP 7 NPW Phase 1 - Appendix G - CWSRF Grand Funding Project Envi Report WRP 7 NPW Phase 1 - Appendix F2 - Federally Protected Species Assessment Table WRP 7 NPW Phase 1 - Appendix F1 - USFWS IPaC Species Lists Appendix H - Mitigation Monitoring and Reporting Program North Cathedral City Regional Stormwater - Notice of Determination Appendix F - Project Materials Appendix E - Response to Comments North Cathedral City Regional Stormwater IS-EA North Cathedral City Regional Stormwater IS-EA Reservoirs 4711-3, 4711-4 Project - NOD 05/30/2023 Reservoirs 4711-3, 4711-4 Project - Appendix G - Response to Comments on the Draft IS-MND 05/30/2023 Whitewater River Groundwater Replenishment Facility Project – Notice of Determination 05/09/2023 Whitewater - Final EIR 05/04/2023 North Cathedral City Regional Stormwater Project - Appendix B - Biology 04/26/2023 North Cathedral City Regional Stormwater Project - Appendix C - Cultural Resources and AB 04/26/2023 North Cathedral City Regional Stormwater Project - Appendix A - Air Quality Emissions Data 04/26/2023 North Cathedral City Regional Stormwater Project - Notice of Intent 04/26/2023 North Cathedral City Regional Stormwater Project - Draft North Cathedral City IS-EA 04/26/2023 North Cathedral City Regional Stormwater Project - Appendix D - O&M Manual CVWD Covered Activities 04/26/2023 Thousand Palms Flood Control Project - Appendix C - Biological Resources Documentation 01/19/2023 Sanitation Master Plan Update 2020 - Final PEIR November 2022 12/20/2022 Sanitation Master Plan Update 2020 - NOD Posting 12/20/2022 Thousand Palms Flood Control Project - Notice of Determination 12/20/2022 Thousand Palms Flood Control Project - Final EIR-EIS 12-01-22 12/20/2022 ECVWS - FONSI St Anthony MHP Water Line TR-4313b-P5 J54 595T 10/25/2022 ECVWS - Final IS-MND St Anthony MHPCP 10/25/2022 ECVWS - Final ISMND St Anthony Appendices 10/25/2022 ECVWS - Notice of Intent St Anthony MHPCP 10/25/2022 ECVWS - Notice of Determination St Anthony MHPCP 10/25/2022 ECVWS - Notice of Availability FONSI St Anthony MHP Water Line TR-4313b-P5 J54 595T 10/25/2022 Thousand Palms Flood Control Project - Appendix B Air Quality Calculations 04/01/2022 Thousand Palms Flood Control Project - Appendix A Public Scoping 04/01/2022 Thousand Palms Flood Control Project - NOA NOC TPFC Project 04012022 Revised w figure 04/01/2022 Thousand Palms Flood Control Project - Appendix G Paleontological Resources Assessment 04/01/2022 Thousand Palms Flood Control Project - Appendix F Noise Calculations 04/01/2022 Thousand Palms Flood Control Project - Appendix E Cultural Resources 2021 SHPO Consultation Letter 04/01/2022 Thousand Palms Flood Control Project - Appendix D Preliminary Jurisdictional Waters and Wetlands Del 04/01/2022 Avenue 66 Trunk Sewer Project - Final Initial Study and Mitigated Negative Declaration 03/29/2022 Avenue 66 Trunk Sewer Project - Final Mitigation Monitoring and Reporting Program 03/29/2022 BS5513 Res5514-2 - Appendix C Cultural Resources Assessment and AB52 Consultation Letter 03/10/2022 Avenue 66 Trunk Sewer Project - Appendix E CR memo and maps 070221 APE Update 03/10/2022 Avenue 66 Trunk Sewer Project - Appendix D Sun Bird Sewer Cultural Tech Report REVISED July2020 03/10/2022 Palm Desert Groundwater Replenishment Project - Final EIR 02/22/2022 CV Stormwater Channel Improvement Project, Final EIR 02/22/2022 Reservoirs 4711-3, 4711-4 Project - Public Final IS-MND 11/18/2021 CVWD Airport Blvd Sewer - Final ISMND 11/12/2021 BS5513 Res5514-2 - Final ISMND 11/10/2021 2020-2021 NPW Connections Project - Final IS-MND 11/10/2021 IXTP7991 - MMRP 08/19/2021 IXTP7991 - NOD 08/19/2021 IXTP7991 ISMND - Final Study 08/19/2021 Avenue 66 Trunk Sewer Project - NOI CVWD Ave 66 Sunbird MND 09/30/2021 Avenue 66 Trunk Sewer Project - Appendix C Biological Survey Nov2018 09/30/2021 Avenue 66 Trunk Sewer Project - Appendix B Bio Resources Assessment 09/30/2021 Avenue 66 Trunk Sewer Project - Appendix A CalEEMod results 09/30/2021 BS5513 Res5514-2 - Appendix B BRTS ISMND 09/29/2021 BS5513 Res5514-2 - Appendix A CalEEMOD ISMND 09/29/2021 BS5513 Res5514-2 - NOI ISMND final 09/29/2021 CVWD Airport Blvd Sewer - Appendix B Biological Resources ISMND 09/29/2021 CVWD Airport Blvd Sewer - Appendix A CalEE Mod Results ISMND 09/29/2021 CVWD Airport Blvd Sewer - NOI MND-v4 (002) 09/29/2021 CVWD Airport Blvd Sewer - Appendix C Cultural Resources ISMND 09/29/2021 Reservoirs 4711-3, 4711-4 Project NOI 09/29/2021 Reservoirs 4711-3, 4711-4 Project - Appendix C - Aquatic Resources Delineation (Wood 2020) 09/29/2021 Reservoirs 4711-3, 4711-4 Project - Appendix B - Biological Survey Report (Wood 2021) 09/29/2021 Reservoirs 4711-3, 4711-4 Project - Appendix A - CalEEMod Analysis (Wood 2020) 09/29/2021 Reservoirs 4711-3, 4711-4 Project - Appendix F - 8-Step Floodplain Analysis (Wood 2021) 09/29/2021 Reservoirs 4711-3, 4711-4 Project - Appendix E - AB 52 Consultation 09/29/2021 Reservoirs 4711-3, 4711-4 Project - Appendix D - Cultural Resources Assessment (Wood 2021) 09/29/2021 Whitewater - Appendix D - O&M Manual CVWD Covered Activities-Facilities within Conservation Areas 08/19/2021 Whitewater - Appendix H - NRCS Soils Report 08/19/2021 Whitewater - Appendix G - Fuel Consumption Calculations 08/19/2021 Whitewater - Appendix F - AB 52 Correspondence 08/19/2021 Whitewater - Appendix E - Cultural Resources Report (October 2017) 08/19/2021 Whitewater - Appendix C - Biological Resources Technical Report (February 2021) 08/19/2021 Whitewater - Appendix B - CalEEMod 08/19/2021 Whitewater - Appendix A - NOP 08/19/2021 Whitewater - Draft EIR NOA and NOC_081921 (002) 08/19/2021 Whitewater - Appendix J - Water Quality Sampling Results 08/19/2021 Whitewater - Appendix I - Soil Sampling Report of Results 08/19/2021 IXTP7991 - Appendix E USDA FORM RD 2006-0038 08/19/2021 IXTP7991 - Appendix D CULTURAL RESOURCES 08/19/2021 IXTP7991 - Appendix C BIOLOGICAL RESOURCES 08/19/2021 IXTP7991 - Appendix B CALEEMOD DATA SHEETS 08/19/2021 IXTP7991 - Appendix A USDA GUIDE 1907-C 08/19/2021 2020-2021 NPW Connections Project - Notice of Intent to Adopt 10/16/2020 2020-2021 NPW Connections Project - Appendix A - Air Quality and Greenhouse Gas Emissions 10/16/2020 2020-2021 NPW Connections Project - Appendix B - FAA Conformity Memo - RCEM Modeling Results 10/16/2020 2020-2021 NPW Connections Project - Appendix C - Biological Resources Technical Study 10/16/2020 2020-2021 NPW Connections Project - Appendix D - Cultural Resources Technical Report 10/16/2020 2020-2021 NPW Connections Project - Appendix E - AB52 Consultation 10/16/2020 2020-2021 NPW Connections Project - Appendix F - Paleontological Resources Memorandum 10/16/2020 2020-2021 NPW Connections Project - Appendix G - Noise Measurement Data Sheets 10/16/2020 CVWD Sanitation Master Plan Update 2020 - NOC-NOA Spanish 09/10/2020 CVWD Sanitation Master Plan Update 2020 - NOC-NOA English 09/10/2020 CVWD Sanitation Master Plan Update 2020 - Appendix C - Biological Resources 09/10/2020 CVWD Sanitation Master Plan Update 2020 - Appendix B - Air Quality 09/10/2020 CVWD Sanitation Master Plan Update 2020 - Appendix A - NOP and Distribution List 09/10/2020 CVWD Sanitation Master Plan Update 2020 - Appendix H - Tribal Cultural Resources 09/10/2020 CVWD Sanitation Master Plan Update 2020 - Appendix G - Noise 09/10/2020 CVWD Sanitation Master Plan Update 2020 - Appendix F - GHG Emissions 09/10/2020 CVWD Sanitation Master Plan Update 2020 - Appendix E - Energy Consumption 09/10/2020 CVWD Sanitation Master Plan Update 2020 - Draft PEIR August 2020 09/10/2020 Whitewater EIR NOP - Exhibit and Scoping Meeting 02/10/2020 Palm Desert Groundwater Replenishment Project EIR Addendum No. 1 2019 12/02/2019 Palm Desert Groundwater Replenishment Project EIR Addendum No. 1 - Stamped Notice of Determination 12/02/2019 Sanitation Master Plan Update 2020 - Notice of Preparation and Scoping Meeting Notice_Sept 2019 09/19/2019 CV Stormwater Channel Improvement Project, Avenue 54 - Appendix J_Jurisdictional Delineation Report 08/10/2019 CV Stormwater Channel Improvement Project, Avenue 54 - Appendix I_Paleontology 08/10/2019 CV Stormwater Channel Improvement Project, Avenue 54 - Appendix H_Jurisdictional Delineation Report 08/10/2019 CV Stormwater Channel Improvement Project, Avenue 54 - Appendix G_Cultural Resources 08/10/2019 CV Stormwater Channel Improvement Project, Avenue 54 - Appendix F_Geotechnical 08/10/2019 CV Stormwater Channel Improvement Project, Avenue 54 - Appendix E_Hydrology 08/10/2019 CV Stormwater Channel Improvement Project, Avenue 54 - Appendix D_Phase I Environmental Site Assess 08/10/2019 CV Stormwater Channel Improvement Project, Avenue 54 - Appendix C_Biology 08/10/2019 CV Stormwater Channel Improvement Project, Avenue 54 - Appendix B_Air Quality 08/10/2019 CV Stormwater Channel Improvement Project, Avenue 54 - Appendix A_Notice of Preparation 08/10/2019 Final IS MND - St Anthony Appendices - September 6, 2019 (PDF) 09/06/2019 Final IS MND - Valley View Appendices - September 6, 2019 (PDF) 09/06/2019 Final IS MND - Valley View - September 6, 2019 (PDF) 09/06/2019 Final IS MND - St Anthony - September 6, 2019 (PDF) 09/06/2019 Palm Desert Groundwater Replenishment Project - Notice of Determination stamped 08/24/2018 Final Program EIR 08/23/2018 2017-18 NPW Connections Project - Final Initial Study - Mitigated Negative Declaration 08/23/2018 2017-18 NPW Connections Project - Mitigation Monitoring and Reporting Program 08/23/2018 NPW Connections Project - Notice of Intent to Adopt 05/15/2018 NPW Connections Project - Appendix C Biological Resources Assessment 05/15/2018 NPW Connections Project - Appendix A CalEEMod 05/15/2018 NPW Connections Project - Appendices CVWD 2017-18 Non-Potable Water Connections Project IS-MND 05/15/2018 CVWD 2017-18 NPW Connections Project Public Final IS-MND 08/09/2018 NPW Connections Project - Appendix G Noise Measurement 05/15/2018 NPW Connections Project - Appendix F AB 52 Tribal Cultural Resources Consultation 05/15/2018 NPW Connections Project - Appendix E Palentological Resources Letter Report 05/15/2018 NPW Connections Project - Appendix D Cultural Resources Technical Report 05/15/2018 Recirculated Draft EIR Notice of Availability 04/26/2018 Recirculated DPEIR Part 2 04/26/2018 Recirculated DPEIR Part 1 04/26/2018 Appendix E Energy Consumption Tables 04/26/2018 Appendix D.3 Mecca-Northshore SMP 04/26/2018 Appendix D.2 Oasis-Valley Floor SMP 04/26/2018 Appendix D.1 Executive Report on the ECVSMP 04/26/2018 Appendix C.2 Paleontological Resource Assessment 04/26/2018 Appendix C.1 Class I Cultural Resources Inventory 04/26/2018 Appendix B Air Quality and GHG Impact Analysis 04/26/2018 Appendix A.3 Scoping Presentation, Sign-in Sheet, NOP Comment Letters 04/26/2018 Appendix A.2 NOP and Distribution List 04/26/2018 Appendix A.1 Initial Study 04/26/2018 Palm Desert Groundwater Replenishment Feasibility Study 11/30/2017 PD Groundwater Replenishment NOC 11/06/2017 PD Groundwater Replenishment NOA 11/06/2017 Appendix E - NOP and Scoping Meeting Materials 11/03/2017 Appendix D - Noise Modeling Results 11/03/2017 Appendix C - Cultural Resources Report 11/03/2017 Appendix B - Biological Resources Assessment 11/03/2017 Appendix A - Air Quality and CalEEMod worksheets 11/03/2017 Notice of Preparation and Public Scoping Meeting 05/23/2017 Table of Contents 05/17/2017 Eastern Coachella Valley Stormwater Master Plan - Notice of Preparation 02/16/2017 Highway 86 Domestic Water Transmission Main Phase 2 and Pump Station - Initial Study/Mitigated Negat 02/16/2017