Construction update: flood protection

Posted on December 2, 2020 at 3:55 PM by Diane Carmony

Here are some highlights about the Coachella Valley Stormwater Channel (CVSC) Avenue 62 to Avenue 64 Bank Protection and Fillmore Ditch Outfall Improvement Project

The overall construction of the improvements to the CVSC bank slope protection (adjacent to Wastewater Reclamation Plant No. 4 (WRP 4)) and the Fillmore Ditch outfall is 80% complete.

 The project consists of the construction of about 5400 linear feet concrete slope protection and a 10-cell reinforced concrete boxes for outfall from the existing Fillmore Ditch into the CVSC. This project when completed will provide regional flood protection along with the associated lateral scour to the WRP 4 Facility site during the 100-year storm event. 

Traffic interruptions: none
Water shutoffs: none, except two half-day sewer force main interruptions this month or early January.  