Eastern Coachella Valley Stormwater Master Plan

The Eastern Coachella Valley Stormwater Master Plan Project (Master Plan) is designed as a long-term, comprehensive stormwater master plan that identifies conceptual locations, alignments, and sizes for primary stormwater facilities within the 167 square mile Study Area. The Master Plan is a planning guide for locating and sizing regional stormwater and drainage facilities (Facilities). It is anticipated these Facilities will be constructed by CVWD and/or others over time as continued urban development takes place within the area. The Master Plan has been designed to be inherently flexible to allow CVWD to respond to changed physical, environmental, regulatory, and economic conditions.


Documents


Notice of Preparation and Public Scoping Meeting
 

SCV SMP Draft PEIR

Notice of Availibility and Notice of Completion Notice of Availability and Notice of Completion
Draft PEIR Cover Draft PEIR Cover
Table of Contents Table of Contents
1 Executive Summary 1 Executive Summary
2 Introduction 2 Introduction
3 Project Description 3 Project Description
4 EEFNS 4 EEFNS
5 Environmental Assessment 5 Environmental Assessment
5.1 Ag and Forestry Resources 5.1 Ag and Forestry Resources
5.2 AQ and GHG 5.2 AQ and GHG
5.3 Biological Resources 5.3 Biological Resources
5.4 Cultural Resources 5.4 Cultural Resources
5.5 Hydrology and Water Quality 5.5 Hydrology and Water Quality
5.6 Noise 5.6 Noise
6 Other CEQA Topics 6 Other CEQA Topics
7 Alternatives 7 Alternatives
8 References and Persons Consulted 8 References and Persons Consulted
Appendix A.1 Initial Study Appendix A.1 Initial Study
Appendix A.2 NOP and Distribution List Appendix A.2 NOP and Distribution List
Appendix A.3 Scoping Presentation, Sign-in Sheet, NOP Comment Letters Appendix A.3 Scoping Presentation, Sign-in Sheet, NOP Comment Letters
Appendix B Air Quality and GHG Impact Analysis Appendix B Air Quality and GHG Impact Analysis
Appendix C.1 Class I Cultural Resources Inventory Appendix C.1 Class I Cultural Resources Inventory
Appendix C.2 Paleontological Resource Assessment Appendix C.2 Paleontological Resource Assessment
Appendix D.1 Executive Report on the ECVSMP Appendix D.1 Executive Report on the ECVSMP
Appendix D.2 Oasis-Valley Floor SMP Appendix D.2 Oasis-Valley Floor SMP
Appendix D.3 Mecca-Northshore SMP Appendix D.3 Mecca-Northshore SMP
Appendix E Energy Consumption Tables Appendix E Energy Consumption Tables